Design/Build


Company Profile
Design/Build
Excavation
S-Span Systems
Structural Steel
Pre-Engineered Steel
Questions  

 

Projects Underway:
 
Grand Rapids Sikh Temple
General Construction
Grand Rapids

Duncan Aviation
General Construction
Battle Creek

Celebration Cinema
Structural Steel
Grand Rapids & Portage

Borgess Hospital
Structural Steel
Kalamazoo

Gun Lake Estates
Residential Construction
Gun Lake

D & W Food Centers
General Construction
Caledonia

 



 

 

 

  


Design/Build

Design/Build is a cutting edge construction method, which, because of its many benefits, is receiving considerable attention in the construction world. By far, it is the fastest growing method of project delivery in the country.Download this free booklet.

Design/Build simply means:
"
A project delivery system that seeks to consolidate construction experts in a single point of contact for the Owner, delegating the responsibility of design and construction delivery issues under one roof."

Advantages of Design/Build

  1. You get early cost input from your contractor. A price is put on conceptual design ideas as they are developed.
  2. A GUARANTEED MAXIMUM PRICE can be determined early, right after the scope of the project has been determined.
  3. Time can be saved because construction can begin before the design is completed. For example, an architect could be completing interior designs while the site and foundation work is underway. This technique is called FAST TRACKING.
  4. The need for high-cost change orders is eliminated.
  5. Architectural and engineering fees are kept to a minimum, and determined from the beginning.
  6. Contractor fees are kept to a minimum, and determined from the beginning.
  7. Legal fees are kept to a minimum by eliminating adversary roles.
  8. Construction costs are minimized by using the latest systems and methods that the contractor KNOWS  are effective.
  9. Chances for misunderstandings are minimized with a team approach.
  10. You get the best ideas from your team members due to the cooperative team spirit.
  11. Realistic completion dates are established by the contractor who will do the work.
  12. You can take advantage of special services such as a preliminary feasibility study, value engineering and life cycle cost analysis.
    Used with permission from Group Communications. 

 

 

 